Milepave™ Overlay – Concrete Carriageway

In 2015 Cheshire West and  Chester commissioned Miles Macadam to provide a solution to another of their ongoing issues—that of failing concrete overlays.  Miles Macadam had carried out many projects with the Local Authority, resolving problems with their Bus Station, Bus Laybys and Park and Rides in the past.  This was just another Grouted Macadam solution.

A programme of carriageways was put forward to price, involving planing, pre-treatment of the joints and reflective cracking, a 40mm overlay of Milepave Asphalt Grouted Macadam and the post treatment of the joints to mitigate reflective cracking.  Miles Macadam offered their standard five year warranty, involving yearly inspections of the joints to ensure the surface remained sealed and fully impervious, thereby protecting the valuable infrastructure below.  Five years on, the investment and faith have been truly justified.

 

 

05 Aug 2020
  • ClientCheshire West & Cheshire (CWAC)
  • Product usedMilepave™
  • Year2015